VSZ Kosice heat and power plant (HPP)
* Project preliminary and final designs.
The
design dealt with the construction of a 779 MWh and 112 MWe heat and
power plant for the industrial enterprise of VSZ Kosice.
Spolana Neratovice heat and power plant
* Project preliminary and final designs.
The design dealt with the construction of a 302 MWh and 65 MWe HPP for the industrial enterprise of Spolana Neratovice.
Prerov heat and power plant
* Project preliminary and final designs.
The design dealt with the construction of a 234 MWh and 25 MWe HPP for the town of Prerov and a local industrial enterprise.
Zilina heat and power plant
* Project preliminary and final designs.
The design dealt with the construction of a 211 MWh and 24 MWe HPP for the town of Zilina and a local industrial enterprise.
JCP Sturovo heat and power plant
* Project preliminary and final designs.
The design dealt with a 272 MWh and 25 MWe HPP for the industrial enterprise of JCP Sturovo.
Duslo Sal'a heat and power plant
* Project preliminary and final designs.
The design dealt with a 81 MWh and 37 MWe HPP for the industrial enterprise of Duslo Sara.
Cerveny mlyn heat and power plant
* Project preliminary and final designs.
The design dealt with the construction of a 39 MWh HPP for the Brno Borough of Cerveny mlyn.
Otrokovice heat and power plant
* Project preliminary and final designs.
The design dealt with the construction of a 345 MWh and 37 MWe HPP for the town of Otrokovice and a local industrial enterprise.
Michle heat and power plant
* Project preliminary and final designs.
The design dealt with the construction of a 105 MWh and 12 MWe HPP for the Prague Borough of Michle.
Holesovice heat and power plant
* Project preliminary and final designs.
The design dealt with the construction of a 207 MWh and 12 MWe HPP for the Prague Borough of Holesovice.
Bratislava II. heat and power plant
* Project preliminary and final designs.
The design dealt with the construction of a 207 MWh and 24,5 Mwe HPP for the Bratislava Borough of Bratislava II.
Bratislava III. heat and power plant
* Project preliminary and final designs.
The design dealt with the construction of a 160 MWh and 6 MWe HPP for the Bratislava Borough Bratislava
III.Chemko Strazske
* Project preliminary and final designs.
A complete design documentation for the construction of power engineering structures was prepared.
Zvolen 1, Zvolen 2 heat and power plant
* Project preliminary and final designs.
The design dealt with the local heat supply system in the town of Zvolen.
Zilina 1-3 Heat and power plant
* Project preliminary and final designs.
The design dealt with the local heat supply system in the town of Zilina.
Kosice heat and power plant
* Project preliminary and final designs.
A corn-complete design documentation for the construction of power engineering facilities were prepared.
Chemlon Humenne heat and power plant
* Project preliminary and final designs.
The design dealt with the construction of a 272 MWh and 25 MWe HPP for the industrial enterprise of JCP
Sturovo.
Heating plants: Cadca, Zarnovica, Trencin, Nove Zamky, Myjava, Kysucke Nove Mesto
* Project preliminary and final designs.
The projects dealt with heating plants for the respective towns and local industrial enterprises.
Heat supply pipelines : Novaky - Prievidza power plant, Opatovice - Hradec Kralove power plant, Jaslovske Bohunice - Trnava NPP
* Project preliminary and final designs.
The designs dealt with long-distance heat supply.
Heat supply pipeline: Mochovce NPP - Nitra, Levice, Zlate Moravce
* An engineering and economic study.
The study dealt with feasibility of longdistance transport of heat to given localities.
Slovnaft a.s. Heat and Power Plant
* Design for building permission proceedings.
The design dealt with
effective and ecological generation of heat, innovation of K3 boiler
and ecological operation of K1 ,K2 a K7.K8 boilers in Slovnaft a.s.
Bratislava HPP.
* Project final design
The design dealt with the HPP wash water system.
Matadorex Bratislava HPP
* Project design for building permission proceedings and the final design.
The design dealt with the reconstruction of the K4 boiler.
Blumentalska - Bratislava boiler house
* A turnkey delivery including design for building permission proceedings and final design.
With the capital investment the boiler house was reconstructed and rendered gas-fired.
CCP - Bratislava II. heat and power plant
* A studyThe study dealt with the integration of the CCP block of the Bratislava II HPP into the ZSE a SE grid and into the CHSS Bratislava - east.
Bratislava incineration plant
* A study
The study dealt with the possibilities and conditions of the construction of an incineration plant for Bratislava.
Sliac Kovacova Inc. Spa - Reconstruction of the heat system - Spa and residential sections
* Project final design.
The design dealt with the reconstruction of two CHS for supplying heating and domestic hot water. In both boiler houses the condensing technology will be applied.
Nove Zamky housing stock administrator - Reconstruction of heat economy of the town of Nove Zamky.
* Project design for building permission proceedings and the final design, architect's supervision
The designs dealt with the reconstruction of the CHS Dvorska cesta, Phase I, installation of a 12MW hot water boiler.
* Project design for building permission proceedings and the final design. The design dealt with the reconstruction of the CHS Dvorska cesta, Phase III - Installation of two CCU's with an output of 1 x 2,7MWe plus 1 x 2MWe and their autonomous operation together with the hot water boiler and the existing boilers.
* A scatter study for a heat source with the overall output of 86,8 MWh a 4,7 MWe.
Fortunae Levice, s.r.o. - Rationalisation of the heat system of the town of Levice.
* A study with a sensitivity analysis.
In the study were elaborated the possibilities of supplying the town of Levice with heat with an outlook until 2015, based on the reconstruction of the central heat source of Levice. By way of an economy analysis reconstruction variants of the CHS were assessed - with supply of heat only in hot water (up to an output of 120 MW) and variants with combined production of heat and electrical energy (with gas engines or a small CCP, as the case may be, up to an output of 85 MWh in hot water and 19 MWe electricity).
Zlaty Bazant Inc. Hurbanovo - Standby power unit.
* Project final design.
The design dealt with the installation of a standby power unit and ensuring fuel supply for the heat source.
Levitex Inc. Levice - Heat system racional-ization.
* A studyThe study contains an assessment of the possibility of supplying the town of Levice with heat by way of cooperation of the CHS Levice (output 33 MW in hot water) and heat supply from the reconstructed HPP a.s. Levitex (output 1251 steam/hour, 8 MWe).
Podunajske Biskupice Hospital - Reconstruction of the steam boiler house
* Project final design.
The design dealt with the reconstruction of the steam boiler house in the hospital CHS (with an output of 2 t steam/h, 3,5 MW in hot water and 0,28 MWe).
NsP Nitra - Reconstruction of the heat and incineration system of the Nitra Hospital area complex.
* Project design for building permission proceedings and the final design.
The design dealt with the hospital heat system utilizing combined cycle production of heat and electricity including reconstruction of the special waste incineration plant.
SKAL & CO, s.r.o. Skalica - Restructuring of heat supply to the town of Skalica
* A study
The study was elaborated in several variants for the solution of the heat system in the town of Skalica
EVO I Vojany - Automatic control of TG3 and TG4 lubricating oil temperature in EVO I.
* Project final design.
The design dealt with the automatic control of lubricating oil temperature.
Nitra Regional Office.
* An energy audit.
An energy audit was performed on 15 selected buildings followed by analyses of data obtained and a proposal of the most effective solutions for the energy system rationalization.
Matador Inc. Puchov - Upgrade of boiler feedwater degassing and condensate mana-gement in the Matador Inc. Puchov heat and power plant.
* Project final design.
The design dealt with the upgrade of boiler feedwater degassing and condensate management for the HPP boiler house with an output of boilers of 120 tp/h.
|